Request a quote

Two-component epoxy primer MONE 801

Two-component epoxy primer

Packaging
20 kg
Request a quote

Description

Two-component epoxy primer MONE 801 consists of: component A (epoxy resin) and component B (hardener). Used for priming concrete, aerated concrete, brick and metal structures. Provides adhesion, removes dust from the substrate, with the possibility of further application of polyurea coatings.

Characteristics

Physical and chemical properties

Property

Units Value
Component A (Resin) Component B (Hardener)
1. Appearance Visual Homogeneous transparent viscous liquid Homogeneous yellow-brown liquid
2. Viscosity (Brookfield, spindle 3, 25 oC), max Pa∙s 15 4
3. Density (25oC) g/m3 1.40 0.9 - 1.1
4. Solids content % 96
5. Pot life of the mixture (20oC) min 30-45

Mix ratio by weight: Component A : Component B = 100:25

Technological properties

Property Value Test method
Bending elasticity, mm 1 GOST 52740-2007
Impact strength, cm 50 GOST R 53007-2008
Hardness, Shore D 75-80 DIN 53505 (after 7 days at +23°C)
Adhesion, MPa, min 2.5 GOST 32299-2013
Tack-free time, h (25°C) 3-5 GOST 19007-73
Curing time of thin layers, h (25°C) 9-10 GOST 19007-73

Application technology

For professional use only!

To obtain a quality coating, surface preparation must be carried out in accordance with applicable construction and technical standards (the surface must be dry, degreased, and free of dirt, dust and old coating).

Do not mix the components by hand!

  • Recommended substrate temperature: from +15 to +25°C.
  • Recommended air temperature: from +15 to +25°C.
  • Recommended substrate moisture: no more than 4%.
  • Recommended thickness of one layer: 50÷70 μm.

Recommended number of layers as a primer coat:

  1. For non-porous materials: 1÷2,
  2. For porous materials: 2÷3.

Recommended recoat interval at +20°C is from 8 to 24 hours; exceeding the recoat interval reduces adhesion. If there are no signs of gelling or thickening of the mixture, it may still be used.

The substrate temperature during application and until the coating is fully cured must be at least 3°C above the dew point. Condensation forming on the concrete surface during application and curing of the polymer coating may cause defects and lead to partial or complete delamination from the concrete substrate. Drafts during application may also cause coating defects such as orange peel or rippling.

Equivalents

Sikafloor-150; Sikafloor-151; Sika Primer-150 MB; Sipp-Epoxy Primer HS; LEVL Coat 101; LEVL Coat 102W

Need a quote or technical advice?

Tell us about your application, volumes and destination. Our team will reply with a proposal and technical data sheets.

Request a quote