Polyurethane self-levelling floor MONE 720
Polyurethane self-levelling floor MONE 720 is a two-component, coloured polyurethane compound for creating polymer coatings.
Description
Polyurethane self-levelling floor MONE is a two-component, coloured polyurethane compound for creating polymer coatings. Made from in-house produced polyester polyols. Contains no solvents. Provides high strength, flexibility and durability of the coating. Has a semi-gloss finish.
Application technology
Substrate preparation
The surface must be pre-dedusted, mechanically ground down to sound concrete, cleaned of dirt, oil traces and greasy substances, filled (if necessary) and primed. Before applying the primer, make sure the concrete moisture content does not exceed 4%. The recommended substrate temperature is from +10℃ to +30℃.
Allow the primer to dry; if the surface has not acquired a semi-matte or semi-gloss sheen, apply a second coat of primer. For porous substrates, apply 2–3 coats of primer; for non-porous substrates, 1–2 coats.
Work only with pre-degreased tools, and use dedicated site footwear only.
Material preparation
Pre-mix component A, pour it into a clean container and mix for 2–3 minutes before adding component B. Use a mixer attachment for mixing. After adding component B, mix for 4–5 minutes until a uniform shade is achieved.
While mixing, form a vortex in the centre of the container down to 15–30% of the container depth.
If required, add quartz sand to the mixture.
Material application
Apply the ready mixture onto the pre-primed surface and spread it evenly with a tool, avoiding more than a 20-minute interval between successive pours. The mixture is spread with even strokes using a squeegee, trowel or screed rule.
The second layer (if needed) is applied perpendicular to the first, no sooner than 6 hours and no later than 24 hours after applying the first layer. To remove air bubbles from the coating, thoroughly treat the surface with a spiked roller.
The coating can be put into service no earlier than 24 hours after application, at a room temperature of at least 20°C.
Self-levelling floor consumption
Self-levelling floor thickness, including the base layer (2 mm), excluding primer, filler and varnish
|
SELF-LEVELLING FLOOR THICKNESS |
SELF-LEVELLING LAYER |
TOTAL SELF-LEVELLING FLOOR CONSUMPTION (BASE + SELF-LEVELLING LAYER) |
|
|
THICKNESS |
SELF-LEVELLING FLOOR CONSUMPTION |
||
|
2.0-2.5 mm |
1.5 mm |
2.25 kg/m2 |
3.0 kg/m2 |
|
3.0-3.5 mm |
2.5 mm |
3.75 kg/m2 |
4.5 kg/m2 |
|
4.0-4.5 mm |
3.5 mm |
5.25 kg/m2 |
6.0 kg/m2 |
Completed projects
PROJECT – KEPLER VISION CENTRE, MOSCOW
Area – 93 m².
Timeframe – 10 days
Task – installation of a self-levelling floor at a retail outlet of the German vision centre Johann Kepler, finish layer thickness – 2 mm.
Kepler requested a polymer self-levelling floor coating in the corporate colour. To fulfil this order, our production facility coloured the self-levelling floor to the required RAL shade. All work — from substrate grinding to applying the finish coating and sealing it with gloss varnish — was completed in 7 days.
PROJECT – MUSEUM OF COMMUNICATIONS, SAINT PETERSBURG
Area – 280 m².
Timeframe – 8 days
Task – renewal of the floor covering in the covered inner courtyard "well" of the museum building, converted into a hall-type space.
Finish layer thickness – 2 mm.
The first stage of work was dismantling the hall's previous covering — porcelain stoneware tile. Then, milling of the rigid tile adhesive left after tile removal. The third stage was pouring a high-strength repair compound with a strength above 30 MPa as a levelling layer. Next, grinding the substrate opens the pores of the concrete base for better primer penetration.
Priming. The polyurethane primer improves adhesion of the finish base to the concrete substrate.
Applying the intermediate layer. This layer levels the surface and seals the pores, preventing "air craters" in the finish layer. Finally, the finish layer was laid with decorative flakes added. After the finish layer dried, varnish with UV protection was applied to the surface.
PROJECT – SMOKE DOG HOOKAH BAR, MOSCOW
Area – 312 m².
Timeframe – 14 days
Installation of the floor covering in the hookah bar's main room
Finish layer thickness – 2 mm.
A geodetic survey was carried out to identify irregularities. The concrete substrate had been poured with uneven ridges across the whole area, to save material and reduce the thickness of the levelling layer. Additional complexity in this project was the unusual design concept. The finish surface had to combine ceramic tile with a self-levelling floor that needed a "smoky" effect. To achieve this effect, white material of the same type was added to the dark grey coating and rolled out with a roller until the desired texture was achieved.
PROJECT – DENTAL CLINIC, SAINT PETERSBURG
Area – 230 m².
Timeframe – 10 days
Task – floor installation. Combine various rooms with a unified covering. Laminate removal. Substrate grinding to open pores and improve adhesion. Priming with polyurethane primer. Applying the intermediate layer. Laying the finish layer. Coating the surface with matte varnish.
PROJECT – UNDERGROUND PARKING AT THE "BRILLIANT HOUSE" RESIDENTIAL COMPLEX, SAINT PETERSBURG
Area – 350 m².
Timeframe – 6 days
Task – installation of a thin-layer self-levelling floor coating in an indoor parking area. Substrate grinding. Coating with polyurethane primer. Installation of the thin-layer self-levelling coating.
PROJECT – SECONDARY SCHOOL No. 464, SAINT PETERSBURG
Area – 230 m².
Timeframe – 14 days
Task – to separate zones of the school premises using polymer self-levelling floors of different colours.
Stages: substrate grinding, coating with polyurethane primer, applying the intermediate layer, applying the finish layer.
PROJECT – PRIVATE GARAGE, SAINT PETERSBURG
Area – 30 m².
Timeframe – 3 days
Task – installation of a self-levelling floor
Stages: substrate grinding, coating with polyurethane primer, applying the intermediate layer, applying the finish layer with decorative flakes added.
PROJECT – PRIVATE GARAGE, SAINT PETERSBURG
Area – 28 m².
Timeframe – 2 days
Task – installation of a self-levelling floor
Stages: substrate grinding, coating with polyurethane primer, applying the intermediate layer, applying the finish layer with decorative flakes added.
Storage conditions
The components of the MONE 720 system should be stored in covered warehouse premises at a temperature from +5℃ to +30℃, protected from moisture, contamination and direct sunlight. Storage under a canopy or in an area protected from precipitation, pollutants, mechanical damage and direct sunlight is permitted.
The guaranteed storage life of the MONE 720 system components is 6 months from the date of manufacture. After this storage period, the product should be tested before each use for compliance with the requirements of this TU, and if compliant, the product may be used by the consumer as intended.
Warranty obligations
For professional use only.
Failure to follow safety procedures and the product application instructions will result in coating defects during the warranty period.
Equivalents
Polyflex 1001, Polyflex 1003; Teping Floor 205 PU "S"; Sikafloor-324; Sipp-SLF-PU
Related products

Epoxy Self-Levelling Floor MONE 820
Two-component epoxy self-levelling floor MONE 820
Details →
Transparent Epoxy Self-Levelling Floor MONE 823D
Epoxy compound for 3D floor installation MONE 823D
Details →
MONE Polycem 3K AS polyurethane-cement system
Polyurethane-cement system for medium and heavy-duty service conditions "MONE Polycem 3K AS".
Details →
Polyurethane Primer MONE 701
Single-component polyurethane primer MONE 701 is applied to mineral and metal substrates, forming an adhesive layer. Cures by moisture in the air.
Details →Need a quote or technical advice?
Tell us about your application, volumes and destination. Our team will reply with a proposal and technical data sheets.