Polyurethane self-levelling floor MONE 720

Polyurethane self-levelling floor MONE 720 is a two-component, coloured polyurethane compound for creating polymer coatings.

Packaging
20 kg
Request a quote

Description

Polyurethane self-levelling floor MONE is a two-component, coloured polyurethane compound for creating polymer coatings. Made from in-house produced polyester polyols. Contains no solvents. Provides high strength, flexibility and durability of the coating. Has a semi-gloss finish.

Application technology

Substrate preparation

The surface must be pre-dedusted, mechanically ground down to sound concrete, cleaned of dirt, oil traces and greasy substances, filled (if necessary) and primed. Before applying the primer, make sure the concrete moisture content does not exceed 4%. The recommended substrate temperature is from +10℃ to +30℃.

Allow the primer to dry; if the surface has not acquired a semi-matte or semi-gloss sheen, apply a second coat of primer. For porous substrates, apply 2–3 coats of primer; for non-porous substrates, 1–2 coats.

Work only with pre-degreased tools, and use dedicated site footwear only.

Material preparation

Pre-mix component A, pour it into a clean container and mix for 2–3 minutes before adding component B. Use a mixer attachment for mixing. After adding component B, mix for 4–5 minutes until a uniform shade is achieved.
While mixing, form a vortex in the centre of the container down to 15–30% of the container depth.
If required, add quartz sand to the mixture.

Material application

Apply the ready mixture onto the pre-primed surface and spread it evenly with a tool, avoiding more than a 20-minute interval between successive pours. The mixture is spread with even strokes using a squeegee, trowel or screed rule.

The second layer (if needed) is applied perpendicular to the first, no sooner than 6 hours and no later than 24 hours after applying the first layer. To remove air bubbles from the coating, thoroughly treat the surface with a spiked roller.

The coating can be put into service no earlier than 24 hours after application, at a room temperature of at least 20°C.

Self-levelling floor consumption

Self-levelling floor thickness, including the base layer (2 mm), excluding primer, filler and varnish

SELF-LEVELLING FLOOR THICKNESS

SELF-LEVELLING LAYER

TOTAL SELF-LEVELLING FLOOR CONSUMPTION (BASE + SELF-LEVELLING LAYER)

THICKNESS

SELF-LEVELLING FLOOR CONSUMPTION

2.0-2.5 mm

1.5 mm

2.25 kg/m2

3.0 kg/m2

3.0-3.5 mm

2.5 mm

3.75 kg/m2

4.5 kg/m2

4.0-4.5 mm

3.5 mm

5.25 kg/m2

6.0 kg/m2

Completed projects

PROJECT – KEPLER VISION CENTRE, MOSCOW

Area – 93 m².

Timeframe – 10 days

Task – installation of a self-levelling floor at a retail outlet of the German vision centre Johann Kepler, finish layer thickness – 2 mm.

Kepler requested a polymer self-levelling floor coating in the corporate colour. To fulfil this order, our production facility coloured the self-levelling floor to the required RAL shade. All work — from substrate grinding to applying the finish coating and sealing it with gloss varnish — was completed in 7 days.

PROJECT – MUSEUM OF COMMUNICATIONS, SAINT PETERSBURG

Area – 280 m².

Timeframe – 8 days

Task – renewal of the floor covering in the covered inner courtyard "well" of the museum building, converted into a hall-type space.

Finish layer thickness – 2 mm.

The first stage of work was dismantling the hall's previous covering — porcelain stoneware tile. Then, milling of the rigid tile adhesive left after tile removal. The third stage was pouring a high-strength repair compound with a strength above 30 MPa as a levelling layer. Next, grinding the substrate opens the pores of the concrete base for better primer penetration.
Priming. The polyurethane primer improves adhesion of the finish base to the concrete substrate.
Applying the intermediate layer. This layer levels the surface and seals the pores, preventing "air craters" in the finish layer. Finally, the finish layer was laid with decorative flakes added. After the finish layer dried, varnish with UV protection was applied to the surface.

PROJECT – SMOKE DOG HOOKAH BAR, MOSCOW

Area – 312 m².

Timeframe – 14 days

Installation of the floor covering in the hookah bar's main room

Finish layer thickness – 2 mm.

A geodetic survey was carried out to identify irregularities. The concrete substrate had been poured with uneven ridges across the whole area, to save material and reduce the thickness of the levelling layer. Additional complexity in this project was the unusual design concept. The finish surface had to combine ceramic tile with a self-levelling floor that needed a "smoky" effect. To achieve this effect, white material of the same type was added to the dark grey coating and rolled out with a roller until the desired texture was achieved.

PROJECT – DENTAL CLINIC, SAINT PETERSBURG

Area – 230 m².

Timeframe – 10 days

Task – floor installation. Combine various rooms with a unified covering. Laminate removal. Substrate grinding to open pores and improve adhesion. Priming with polyurethane primer. Applying the intermediate layer. Laying the finish layer. Coating the surface with matte varnish.

PROJECT – UNDERGROUND PARKING AT THE "BRILLIANT HOUSE" RESIDENTIAL COMPLEX, SAINT PETERSBURG

Area – 350 m².

Timeframe – 6 days

Task – installation of a thin-layer self-levelling floor coating in an indoor parking area. Substrate grinding. Coating with polyurethane primer. Installation of the thin-layer self-levelling coating.

PROJECT – SECONDARY SCHOOL No. 464, SAINT PETERSBURG

Area – 230 m².

Timeframe – 14 days

Task – to separate zones of the school premises using polymer self-levelling floors of different colours.
Stages: substrate grinding, coating with polyurethane primer, applying the intermediate layer, applying the finish layer.

PROJECT – PRIVATE GARAGE, SAINT PETERSBURG

Area – 30 m².

Timeframe – 3 days

Task – installation of a self-levelling floor

Stages: substrate grinding, coating with polyurethane primer, applying the intermediate layer, applying the finish layer with decorative flakes added.


PROJECT – PRIVATE GARAGE, SAINT PETERSBURG

Area – 28 m².

Timeframe – 2 days

Task – installation of a self-levelling floor

Stages: substrate grinding, coating with polyurethane primer, applying the intermediate layer, applying the finish layer with decorative flakes added.



Storage conditions

The components of the MONE 720 system should be stored in covered warehouse premises at a temperature from +5℃ to +30℃, protected from moisture, contamination and direct sunlight. Storage under a canopy or in an area protected from precipitation, pollutants, mechanical damage and direct sunlight is permitted.

The guaranteed storage life of the MONE 720 system components is 6 months from the date of manufacture. After this storage period, the product should be tested before each use for compliance with the requirements of this TU, and if compliant, the product may be used by the consumer as intended.

Warranty obligations

For professional use only.

Failure to follow safety procedures and the product application instructions will result in coating defects during the warranty period.

Equivalents

Polyflex 1001, Polyflex 1003; Teping Floor 205 PU "S"; Sikafloor-324; Sipp-SLF-PU