Request a quote

TWO-COMPONENT POLYURETHANE COMPOUND FOR ROAD AND CONSTRUCTION WORKS «ECOCRIT 1800S»

Sealant for expansion joints and coatings

Request a quote

Description

ECOCRIT 1800S is a self-levelling, pour-in-place system; it is a two-component polyurethane compound used together with a filler.
The cured ECOCRIT 1800S material absorbs impact loads caused by traffic and distributes them evenly over the substrate, and has high abrasion resistance.
It is used for sealing expansion joints, forming transition zones, and reducing impact loads from vehicle wheels.

Material characteristics

PARAMETER

VALUE

Appearance, visual

Uniform black liquid

Hardness, Shore D

40±10

Elongation at break, %

110-130

Tensile strength, MPa

Not less than 4.5

Adhesion to concrete, not less than, MPa

1.8

Pot life of the mixture, min

+15oC

+30oC

30-40

10-25

Cure time to working load,

at +20oC, hours, max

2-3

Full cure time,

hours, max

48

Recommendations

Substrate requirements:

  • The substrate must be dry and clean, with a moisture content of no more than 5%.
  • It is prohibited to apply ECOCRIT 1800S to a depth of more than 100 mm in a single pour.
  • For depths exceeding 100 mm, pour in several stages, allowing each layer to cure before pouring the next.
  • Before application, check the joint groove for dirt and ensure the edges are even. The base of the groove must be dry and sound.
  • Pour the prepared mixture into the prepared groove. After pouring, level the material using a metal straightedge or spatula. For small areas, a steel trowel may be used.
  • When filling the groove with ECOCRIT 1800S, the material surface may exceed the level of the asphalt concrete pavement, concrete edging, or metal profile by +(3-5) mm.

Sealant requirements:

  • At low temperatures, the components and tools must be warm to facilitate mixing of the system.
  • In hot weather, avoid heating the components and exposure to direct sunlight.
  • The optimal ambient temperature for curing is 10-35°C.
  • Cream time at 30°C is 30 minutes. The material can withstand pedestrian loads after 3-4 hours, and vehicle loads after 12 hours. Full cure occurs after 72 hours.

Component mixing procedure:

  1. Add component A to a prepared container and mix with a mixer.
  2. Add component C to component A and mix for at least one minute, or until uniform.
  3. Add component B and continue mixing for two minutes.
  4. The mixing ratios of the components correspond to the quantity of each component supplied in its container.

One set of ECOCRIT 1800S has a pot life of approximately 40 minutes at 15°C. It is prohibited to combine or mix more than two sets of ECOCRIT 1800S at the same time.

When accepting a transition zone made of ECOCRIT 1800S, check the surface evenness at the expansion joint using a straightedge, comparing it against the level determined before the joint was formed. The ECOCRIT 1800S surface may exceed the level of the asphalt concrete pavement by no more than 5 mm. Due to subsequent service compaction and temperature effects, this difference may change by ±2 mm.

Storage and safety

Storage:

  • The components of ECOCRIT 1800S sealant must be stored in a covered warehouse, in hermetically sealed containers, at temperatures from -10°C to +30°C.
  • The guaranteed storage life of ECOCRIT 1800S components in a dry room at temperatures from -10°C to +30°C is 6 months.
  • Storage and transport at temperatures down to -30°C is permitted, provided the storage and transport period does not exceed 1 month.
  • Containers must be transported with lids and plugs facing upward. Transport and storage in open containers is prohibited. Damaged or punctured containers must be emptied.
  • If the container has been opened at the user's site, the material must be used as quickly as possible; the warranty does not apply to it.
  • After the guaranteed storage period has expired, the ECOCRIT 1800S components must be checked for compliance with the technical specification requirements. If compliant, they may still be used as intended.

Safety precautions:

  • Work must be carried out in compliance with the applicable construction safety regulations.
  • Only workers aged 18 and over who have passed a medical examination, been trained in safe working methods, and hold the relevant certificates are permitted to carry out the work.
  • Persons suffering from skin conditions or chronic diseases of the upper respiratory tract or eye mucous membranes are not permitted to work.
  • Before starting work on site, each worker must undergo a workplace safety briefing.
  • Workers involved in the operations must be provided with protective clothing, footwear, and personal protective equipment (cotton trousers and jacket, rubber gloves, leather boots, disposable coveralls, RPG-67A type respirators) and must use them while working.

Need a quote or technical advice?

Tell us about your application, volumes and destination. Our team will reply with a proposal and technical data sheets.

Request a quote