Request a quote
Bestseller

One-Component Stone Adhesive KDK

One-component polyurethane adhesive for stone and mineral fillers (pebble, crushed stone, stone chips). Features elasticity and resistance to vibration and impact loads. Withstands sharp temperature changes and frost.

Packaging
Price per 1 kg
Request a quote

Description

One-component polyurethane adhesive for stone and mineral fillers (pebble, crushed stone, stone chips).
Withstands temperature fluctuations and sub-zero temperatures. Features elasticity, withstands impact and vibration loads. Used as a binder for laying "stone carpet" type coverings.

Service life of the coating

When application requirements are observed, the effective service life of the coating is 3 – 10 years.

Work procedure

Laying seamless coverings of mineral fillers with "Ecotermix PU Adhesive for Stone (1K)" is possible on various surfaces: concrete, cement screed, asphalt concrete, board flooring, OSB. Mixing is recommended to be carried out using a hand-held or stationary construction mixer. The ready mix is laid manually or with an auto-laying machine. Spreading the mix and joining seams is done manually using rollers and trowels.

The recommended air temperature when applying the adhesive is +10~+30°C, humidity not exceeding 70%. Before application, if necessary (for example, in cold season), the adhesive should be warmed up.

Using the adhesive in conditions of humidity above 70% reduces the pot life of the adhesive.

  • The mineral filler must be dry and dust-free.
  • The surface to be covered must be uniform, dry, and free of contaminants that hinder adhesion before applying the seamless covering. If necessary, the base surface should be primed using MONE 701 PU primer.
  • Load the mineral filler into the mixer (rotary or screw type). Mixing of the material is carried out manually or mechanically.
  • Add the adhesive in an amount of 5-15% of the total mass of the mineral filler (the amount of adhesive depends on the filler fraction). Mix for 5 minutes.
  • Evenly distribute the finished mixture of adhesive and filler over the surface manually (spread the mix with trowels or screeds, compact with rollers) or using a laying machine.
  • After 24 hours the coating is ready for pedestrian loads, after 3-5 days the coating is ready for full operational loads.

Recommendations for material consumption

FILLER FRACTION, MM

RECOMMENDED ADHESIVE CONSUMPTION RELATIVE TO MINERAL FILLER MASS, %

1-2

6-7

3-5

5-6

5-9

4-5

10

3-4

Characteristics

Dynamic viscosity at 20°C, mPa·s 500 – 6000
Recommended adhesive/filler ratio 5-15% adhesive to filler mass.
Full cure time at 25°C and 65% relative humidity 24 hours — pedestrian loads possible; 3-5 days — full operational loads
Shelf life 12 months


Pot life of the adhesive at +25°C and 65% relative humidity - 20-30 minutes

Need a quote or technical advice?

Tell us about your application, volumes and destination. Our team will reply with a proposal and technical data sheets.

Request a quote